A leading global energy technology company required a complete intake and exhaust acoustic solution for a distributed energy project in Houston, Texas, USA.
The project was developed for a major North American energy company and involved a 5.1MW SGT-100 gas turbine system. The equipment required strict compliance with North American standards, including structural safety, acoustic performance, corrosion protection, and outdoor operating reliability.
CLET provided an integrated design and manufacturing solution for the complete gas turbine intake and exhaust system, including intake silencers, exhaust acoustic ducts, exhaust stack modules, structural supports, and maintenance platforms.
Houston, Texas, USA
Gas Turbine Model:
5.1MW SGT-100 Gas Turbine
Project Name:
North American Oil & Gas Power Project
Delivery Type:
Integrated Design & Manufacturing Delivery
Delivered Products:
Strict North American Outdoor Requirements
The Houston project environment involves:
The complete intake and exhaust system needed to meet North American requirements for:
Complex Structural & Acoustic Integration
The SGT-100 intake and exhaust system required elevated installation with large-span structures.
The design needed to consider:
Improper modular design could result in structural vibration, resonance, and reduced noise reduction performance.
High Cost of Local Construction & Installation
North American construction costs are significantly higher than many other regions.
The customer required maximum factory prefabrication to reduce:
Need for Reliable Export Manufacturing Capability
The project required a supplier capable of providing:
1. Integrated Intake & Exhaust System Design for SGT-100
CLET completed the full engineering development and manufacturing process, including:
Air Intake Acoustic Module
Exhaust Acoustic Duct System
Steel Support Structure & Maintenance Platform
Exhaust Stack Module
The complete system was designed with unified dimensions and interfaces to ensure precise connection with the SGT-100 gas turbine.
2. North American Standard Corrosion Protection & Weather Design
To meet Houston’s outdoor operating conditions, CLET optimized the manufacturing process with:
The solution ensured long-term reliability under high-temperature, dusty, and outdoor operating conditions.
3. Factory Prefabrication & Modular Export Delivery
All major components were completed at CLET’s manufacturing facility:
The equipment was designed into transport-friendly modules suitable for container shipping.
After arrival in Houston, only:
were required, significantly reducing overseas construction workload.
4. Complete Technical Documentation & Project Compliance
CLET provided comprehensive project documentation, including:
All documents complied with international project requirements and successfully passed technical reviews and factory inspections.
Strengthened North American Gas Turbine Supply Capability
CLET successfully delivered a complete intake and exhaust acoustic system for a U.S. distributed energy project, demonstrating reliable export capability for SGT-series gas turbine applications.
Stable Performance Under Harsh Outdoor Conditions
The system achieved required performance in:
Intake dust protection
Exhaust noise reduction
Outdoor corrosion resistance
Structural reliability
and successfully supported long-term operation in Houston.
Reduced Overseas Installation Costs
Factory-prefabricated modular delivery significantly reduced on-site welding, high-altitude construction, and installation workload, improving project efficiency.
Expanded International Cooperation Opportunities
Through successful delivery of this SGT-100 project, CLET established standardized supply capability for North American gas turbine applications and future distributed energy projects.
Showcasing our engineering expertise and successful project experience across aerospace, energy, and industrial sectors.